Architizer Home
Architizer Homepage Projects People Firms Products A+ Awards
LOGIN    REGISTER

Log into Architizer

cancel
 
Login
Forgot your password? Register
News Jobs Competitions
back
next previous
  • Photo: Thomas Lewandowski
  • Photo: Thomas Lewandowski
  • Photo: Thomas Lewandowski
  • Photo: Thomas Lewandowski
  • Photo: Thomas Lewandowski
  • Photo: Thomas Lewandowski
 
 

Multi-Story Carpark, Fraunhofer

Aachen, Germany
 
A project by: JSWD Architekten
 
Architecture
follow
this project
 
post project
on Facebook
 
 

About

As part of the development of the ILT and IPT Fraunhofer Institutes into the Aachen Center of Competence in High-tech Production for Growing Markets, approx. 5,300 m³ of laboratory and office space will be added to the two neighboring buildings. A multi-story car park will be constructed on an adjoining extension plot also owned by Fraunhofer Gese... read more
As part of the development of the ILT and IPT Fraunhofer Institutes into the Aachen Center of Competence in High-tech Production for Growing Markets, approx. 5,300 m³ of laboratory and office space will be added to the two neighboring buildings. A multi-story car park will be constructed on an adjoining extension plot also owned by Fraunhofer Gesellschaft in order to provide additional parking spaces for the extension buildings of the ILT+IPT Fraunhofer Institutes and to supplement the spaces already available on the premises. The multi-storey car park will be constructed alongside the street with an access road built at a 90° angle, whereby the structure will emerge from the current site. The building is designed as an open car park with 8 parking decks using split-level construction and will accommodate 300 cars in total. The chosen construction method will feature an efficient steel, steel-reinforced concrete composite construction system design that overspans the individual levels without the need for supports. The design of the car park facade is based on the central theme of an "artificial green facade". This concept is realized by means of an open facade made up of aluminium profiles that are arranged irregularly on two displaced levels. The original field will be restored by sowing lawn and planting shrubs along the exterior. A concrete slab path will connect it with the ILT+IPT Institutes.
collapse
 
Type Transport - Parking structure
 
 
Location Aachen
Germany
 
Client FRAUNHOFER-GESELLSCHAFT
 
Building status built in 2012
 
Building area 8500 m2
 
 

Project Leader

JSWD Architekten
Cologne, Germany
As: Architecture
 

Team

Add yourself as a Team memberAdd yourself as a Team member
 

Consultants

Were you involved as a consultant?Were you involved as a consultant?
Photography
Thomas Lewandowski
 
 

Photostream

upload imagesUpload your own fan images for this project
 

Weblinks and Articles

addAdd weblinks and articles about this project
online
รถยนต์มือสอง
online
รถยนต์มือสอง
online
รถยนต์มือสอง
online
???????
online
เกมรถแข่ง
 
leave a
comment
follow
this project
 

Search

 
advanced search search
 
 
upload project
 
 
Advertise|FAQ|About Architizer|Privacy Policy|Terms of Use|Contact|Invite
Copyright © 2009 Architizer LLC. All rights reserved. Copyright Policy